Client: Wiss,
Janney, Elstner Associates Inc.
Location:
Chicago, Illinois
Project Sponsor: Illinois Department of Transportation
Project
Description
The objective of the project
was to extend the current service life of the Cedar Street Bridge in
Peoria, Illinois, by developing detailed steel repair and painting
plans to address corrosion throughout the bridge.
Role of Firm
As
a subconsultant to Wiss, Janney, Elstner Associates, Inc., cmQue assisted
in the preparation of final engineering drawings for the rehabilitation
of the Cedar Street Bridge. For this project, cmQue was responsible for computer-aided drafting (CAD) in
the preparation of 42 sheets of design drawings. cmQue also developed
a FTP (file transfer protocol) site to facilitate the transfer of drawings to and from the design
team at WJE . cmQue worked at an accelerated pace
in order to complete the large amount of drafting required within a
4-month timeframe as required by the project.
|
|
|